For specialist planners
With us you can plan

On this page we provide all the documents you need to quickly and easily plan a building project with ventilation units from LUNOS. If you have any questions or suggestions, our technical customer service will be happy to help.
Our design tool is free of charge. It not only allows you to create ventilation plans in accordance with standards, but also provides you with sound calculations and energy protocols, as well as all the necessary documents required for funding applications.
- Main Catalogue
- Prospect Heat Recovery
- Prospect Sound Insulation
- Prospect e²60 Sound Insulation
- Prospect ALD Sound Insulation
- Prospect Exhaust
- Prospect Exhibits
- Flyer Service & maintenance of ventilation systems
- Flyer Wireless System
- Flyer Building Renovation
- Flyer Silvento WLAN module
- Flyer New pbD Heat Exchanger
- Price list 2026
- Alle-Ausschreibungstexte_LUNOS.zip
- LV-Text_1-EGA_1-HWE-2_1HAZ-2.doc
- LV-Text_1-FSE-WE + Z-Stück.doc
- LV-Text_1-FSR-WE-180 + 1-FSR-AZ-180.docx
- LV-Text_1-HSL_Sonderlackierung.docx
- LV-Text_1-HWE-2 + 1-HAZ-2.docx
- LV-Text_1-HWE-115 + 1-HAZ-115.doc
- LV-Text_1-HWE-115 + 1-HAZ-115.docx
- LV-Text_1-HWE_1-HAZ_1-HES.doc
- LV-Text_1-HWE_1-HAZ_1-HES.docx
- LV-Text_1-IL-WE-S + 1-IL-AZ-S.docx
- LV-Text_1-KWE + 1-KAZ.doc
- LV-Text_1-KWE + 1-KAZ.docx
- LV-Text_1-QME-228 + 1-QMK-228.doc
- LV-Text_1-QME-228 + 1-QMK-228.docx
- LV-Text_1-RME-175 + 1-RMK-175.doc
- LV-Text_1-RME-175 + 1-RMK-175.docx
- LV-Text_1-VL-WE-S + 1-VL-AZ-S.doc
- LV-Text_1-VL-WE-S + 1-VL-AZ-S.docx
- LV-Text_1-WE-115_1-AZ-115_1-BE-115_1-RME-150_1-RMK-150.doc
- LV-Text_1-WE-115_1-AZ-115_1-BE-115_1-RME-150_1-RMK-150.docx
- LV-Text_1-WE-180_1-AZ-180_1-BE-180.docx
- LV-Text_1-WE-180_1-AZ-180_1-BE-180_1-FSR-180.doc
- LV-Text_3-AD-UP.doc
- LV-Text_3-AD-UP.docx
- LV-Text_3-AP-B.doc
- LV-Text_3-AP-B.docx
- LV-Text_3-AP.doc
- LV-Text_3-AP.docx
- LV-Text_3-MW-BR.doc
- LV-Text_3-MW-BR.docx
- LV-Text_3-MW.doc
- LV-Text_3-NXT + 3-NXT-AP.doc
- LV-Text_3-S2.doc
- LV-Text_3-UP-2BA.doc
- LV-Text_3-UP-2BR.doc
- LV-Text_3-UP-AS17,5.doc
- LV-Text_3-UP-BA.doc
- LV-Text_3-UP-BR.doc
- LV-Text_3-UP.doc
- LV: 5/BM Motion detector
- LV: Control boards for Silvento ec
- LV: 5/GS Gesture control
- LV: 5/NT 18, 5/NT 60, 5/NT 100 Power supplies
- LV: 5/ZII Time delay module for AB 30/60
- LV-Text_8-B2.doc
- LV-Text_9-IBF-RF.doc
- LV: 9/IBK-H, 9/IBG-H
- LV-Text_9-J30.doc
- LV-Text_9-KVEN-2.doc
- LV-Text_9-MRD.doc
- LV-Text_9-R-160.doc
- LV-Text_9-WDSE.doc
- LV: AB 30/60 Bau Einschub
- LV-Text_AB-30-60-Einschub.doc
- LV-Text_ALD-Einschub.doc
- LV-Text_ALD-S-Einschub.doc
- LV-Text_ALD-SV-Einschub.doc
- LV-Text_e2-Einschub.doc
- LV-Text_e2kurz-Einschub.doc
- LV-Text_e260-Einschub.doc
- LV-Text_e260kurz-Einschub.doc
- LV: ego-RF insert
- LV: ego60-RF insert
- LV: ILD insert
- LV: KNX control4
- LV: LUNOMAT
- LV: LUNOtherm-G
- LV-Text_LUNOtherm-S+.doc
- LV-Text_LUNOtherm-S.doc
- LV: Nexxt-E insert
- LV-Text_RA-15-60-Einschub.doc
- LV: Remote control RC-EO
- LV: Wireless modules FM-EO, SFT-EO, UNI-EO
- LV: Touch Air Comfort CO2-Sensor
- DXF 1/EGA outer hood ego
- DXF 1/HWE 1/HAZ Outer hoods
- DXF 1/IL-S Insect screen
- DXF 1/IL Insect screen
- DXF 1/KWE + 1/KAZ Outer hoods
- DXF 1/WE 180 Outer grilles
- DXF 2/EGI inner screen ego
- DXF 2/S-EC Inner screen
- DXF 2/ZSKA
- DXF 3/AP-B Surface-mounted fire protection housing
- DXF 3/AP Surface-mounted housing
- DXF 3/UP-2BA Two-room fire protection housing
- DXF 3/UP-A
- DXF 3/UP-A with second room connection
- DXF 3/UP-AS10,7
- DXF 3/UP-AS17,5
- DXF 3/UP-BA
- DXF 3/UP-BR
- DXF 3/UP-R
- DXF 3/UP-R with second room connection
- DXF 9/IBE Inner screen
- DXF 9-IBS Sound insulation inner screen
- DXF ALD-S
- DFX ALD cutted
- DXF ego
- DXF e²
- DXF LUNOtherm-G
- DXF LUNOtherm-S
- DXF Nexxt surface-mounted
- DXF Nexxt flush-mounted
- DXF RA 15-60
- DXF drawings Clamp fan
- Technical data sheet Outer grilles 160 series
- Technical data sheet Outer hoods 160 series
- 3/AP-B Surface-mounted fire protection housing
- 3/AP Surface-mounted housing
- 3/UP-2BA Two-room fire protection housing
- 3/UP-2BR Two-room fire protection housing
- 3/UP-AS External wall flush-mounted housing
- 3/UP-BA Flush-mounted fire protection housing
- 3/UP-BR Flush-mounted fire protection housing
- 3/UP Flush-mounted housing
- Technical data sheet 5/GS Gesture control
- Technical data sheet 5/SC-FT
- Technical data sheet 5/SC-RF Smart Comfort wireless control
- Technical data sheet 5/UNI-FT Universal control
- Technical data sheet 5/UNI-RF Wireless control
- Technical data sheet 9/FIB-F7 Fine filter
- 9/IBE, IBG, IBK Inner screens
- Technical data sheet 9/IBF-RF Wireless screen
- 9/IBS Sound Insulation Screen
- Technical data sheet 9/MRD
- Technical data sheet 9/R160 Round duct
- 9/WDS Wind pressure reliefs
- Technical data sheet AB 30/60
- Technical data sheet ALD-SV
- Technical data sheet ALD-S
- Technical data sheet ALD
- Technical data sheet ego-RF
- Technical data sheet ego60-RF
- Technical data sheet ego
- Technical data sheet e²60
- Technical data sheet e²60short
- Technical data sheet e²short
- Technical data sheet e²
- Technical data sheet ILD
- Technical data sheet LUNOMAT
- Technical data sheet LUNOtherm-S/S+
- Technical data sheet Nexxt
- Technical data sheet RA15-60
- Technical data sheet Silvento
- TAC Touch air comfort control
- Certified Component Passive House Institute LUNOMAT
- Recycling certificate for transport packaging 2025
- Recycling certificate for transport packaging 2026
- Passiv House Certificate LUNOMAT
- Approval e² and e²short (in german)
- Approval e²60 (in german)
- Approval e²60short (in german)
- Approval ego (in german)
- Approval LUNOMAT (in german)
- Approval LUNOtherm (in german)
- Approval Silvento (in german)
Note
Ventilation units and their accessories that have a certificate of usability in the form of an abZ (general building authority approval) from the DIBt (German Institute for Building Technology) only meet the requirements of the abZ if they are installed in accordance with the specifications from this abZ and are operated in the described area of application. In order to comply with the requirements of the abZ, particular attention must be paid to the respective, individual installation situations and optionally planned/installed accessories. Compliance with the requirements of the abZ and the state building regulations, for example, must be checked on site.